Rebuilding Project for 138 kV Infrastructure Improvements – Longview Heights to Marshall Project

$
0
0

Print This Page

Longview Heights to Marshall Project
near Longview Texas
Client: American Electric Power


Project Description:

Sargent & Lundy EPC Joint Venture with EC Source Services

  • Public Outreach
  • Engineering and Design /Procurement
  • Construction, Testing, and Commissioning

The Longview Heights to Marshall Project near Longview, Tex., is being implemented to address potential overload of the existing 69-kV line during outages of interconnecting lines.

The overload issue will be resolved by rebuilding the transmission line from the Longview Heights substation to the Marshall substation.

  • Modifications at two substations (Longview Heights and Marshall)
  • Rebuilding 18 miles of 69kV line to 138kV
  • Distribution underbuild

The execution of this project was performed as a Joint Venture entity called ECSL.  Sargent & Lundy is providing the project management, public outreach support, procurement, and engineering & design for these projects. EC Source is providing the construction services.

The engineering work began in March 2016.  Construction started in October 2016 and complete March 2018.

Print This Page

The post Rebuilding Project for 138 kV Infrastructure Improvements – Longview Heights to Marshall Project appeared first on Sargent & Lundy.


Viewing all articles
Browse latest Browse all 18

Latest Images

Trending Articles





Latest Images